Project Portfolio

Master Bathroom Remodel
Complete bathroom renovation including custom tile work, new vanity, and walk-in shower.

LVP Installation
Removed existing flooring and installed new luxury vinyl plank flooring throughout the space and stairs for a clean, modern, and durable finish. Flooring was carefully fitted around walls, doorways, and transitions to create a seamless look and easy maintenance.

Kitchen Tile Backsplash Installation
Modern mosaic backsplash installation featuring mixed stone and glass tile with precision corner alignment and clean edge finishing. Project included careful layout planning around cabinets, outlets, and countertop transitions to create a seamless, updated kitchen look.

Underground Plumbing
Residential underground plumbing installations for new construction. Work included PVC pipe installation for drainage and venting, utility routing, and preparation of gravel sub-base prior to concrete pour.

Master Bathroom Remodel
Complete bathroom remodel featuring a full walk-in shower conversion with updated tile work, waterproofing, and modern fixtures. The outdated enclosed shower was removed and replaced with a clean open-design layout, custom tile surround, recessed shower niche, updated flooring, and refreshed finishes throughout for a brighter, more modern space.

Accessibility Ramp and Stairs
Construction of an accessibility ramp using treated lumber.

Custom Showers
Custom shower installations featuring a variety of tile work, including large-format and mosaic tiles. The projects included full assembly of shower fixtures and waterproofing measures to ensure durability.

Tile Kitchen Backsplash
Installation of a tile kitchen backsplash featuring a contemporary design.

Mail Boxes
Installation and repair of mailboxes in various residential settings. This project involved securing mailbox structures, including decorative and standard models, using appropriate mounting techniques and materials. Work was completed with attention to durability and alignment to enhance functionality.

Tankless Water Heaters
Installation of gas and electric tankless water heaters. Work included plumbing connection, venting, and mounting.

Bathroom Remodel (Before and After)
Full 3-bedroom, 2-bathroom condo remodel including flooring, backsplash, vanity, and fixture installation. Work included cabinet and wall painting, countertop installation, appliance replacement, new light fixtures/fans, and new floor trim installation.
